The Puget Sound Energy (PSE) service area experienced winds ranging from gale force to the equivalent of a category two hurricane over December 14-15, 2006. With soils saturated from previous heavy rains, tens of thousands of trees uprooted, falling onto power lines and substations. More than 40% of PSE’s transmission lines were knocked out of service...Read more...

The Puget Sound Energy (PSE) service area experienced winds ranging from gale force to the equivalent of a category two hurricane over Dec. 14-15, 2006. With soils saturated from previous heavy rains, tens of thousands of trees uprooted, falling onto power lines and substations. More than 40% of PSE’s transmission lines were knocked out of service.

In the aftermath of the storm, PSE began a review to identify what additional measures could be taken to prepare for severe storms, minimize or prevent storm damage and improve the response when outages occur. As trees played a dominant role in the extent of system damage incurred, any successful avoidance or minimization of future storm damage will necessarily entail new, altered or increased vegetation management activities.

Ecological Solutions Inc. of Sherwood Park, Alberta was contracted to audit PSE’s vegetation management program and to assess and quantify conditions that impact tree-caused service interruptions.

This report describes:

  • the investigation process,
  • data collection and analysis
  • resulting conclusions, and
  • recommendations of means and options for transmission system hardening.

This section of the report provides a synopsis of the project, its 27 findings and six recommendations....(Read more...)

About the Author

Sig Guggenmoos | P. Ag. CPC President, Ecological Solutions Inc., Sherwood Park, Alberta, Canada

Education: Bachelor of Science in Agriculture B.Sc.(Agr.)

Accreditations: Professional Agrologist (P.Ag.); Certified Professional Consultant (CPC)

Organizations: Alberta Institute of Agrologists, International Society of Arboriculture, Utility Arborist Association, Industrial Vegetation Management Association of Alberta.

Mr. Guggenmoos was a chief architect of the TransAlta Utilities Distribution Line Clearance program, which reduced tree related outages 80%; saved 48 million dollars over two maintenance cycles; had a 98% customer satisfaction rating; and, showed a 21% increase in contractor crew productivity. He was responsible for the herbicide program, associated research and communication. In addition, he brought a financial focus to the program, developing processes for financial comparisons of alternatives to repetitive tree pruning and was intimately involved in the design and assessment of contracting methods.

As president of Ecological Solutions Inc. (Ecosync) Mr. Guggenmoos provides consulting services in vegetation management and biotic greenhouse gas mitigation strategies including biomass-derived energy.

Publications and Presentations:
Author of numerous abstracts and publications; numerous presentations to public, industry and professional associations including international conferences. List of publications available upon request.