Citect has been selected to install Nexa Monitoring for site power monitoring and control at The Venetian Macao-Resort-Hotel complex currently under construction in Macau.
The complex is a landmark development located on the Cotai Strip of Macau and is the sister development to The Venetian Las Vegas. It comprises a convention and exhibition center (1.2 million square feet), 3,000 hotel suites, casino (546,000 square feet), a 15000-seat entertainment arena, a 1800-seat theater and a retail shopping center (1 million square feet).
Nexa has been selected by CLP Engineering, a wholly owned subsidiary of the CLP Group, and a Citect silver integration partner. The Nexa system will provide monitoring and control of the site's extensive 66-kV, 11-kV and 400-V electrical distribution system. Some of the parameters include: current, voltage, power factor, frequency, real power and harmonic distortion. In addition, Nexa is being used for monitoring and managing alarms, time-based scheduling and trending.
CLP Engineering Limited is undertaking the engineering and system integration of the power monitoring solution at The Venetian Macao with the assistance of Citect Professional Services. CLP Engineering, based in Hong Kong, is a specialist in power engineering and infrastructure E&M projects. Notable clients of CLP include departments in the Hong Kong SAR Government and the Hong Kong Airport Authority.