After a utility structure is returned to alignment, Polecrete® Stabilizer is mixed and poured into the excavation, where it expands to fill voids and transfer loads into the surrounding soil. Its approximately 15-minute set time reduces the time crews and equipment remain around an open excavation. Polecrete Stabilizer provides a higher-density option for demanding straightening applications.