T&D How: Burns & McDonnell

BPA Install of Transmission Line: Framing

A crew frames up an H-Frame 115kV transmission line pole in eastern Washington. Host Utility: Bonneville Power Administration.

Content brought to you by:

Hide comments

Comments

  • Allowed HTML tags: <em> <strong> <blockquote> <br> <p>

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Publish