Steve Gilkey, executive VP of operations for MasTec's substations operations group, introduces the firm's rebuild project for American Electric Power. It is a 22-mile rebuild of 138-kV line that traverses a U.S. forest area. MasTec is sharing the project and some lessons learned in a T&D How video. MasTec can handle substation work all the way through 765-kV transmission projects.